Month: June 2005

Total 5 Posts

Lean & Assembly Line Throughput Times

Who or what is telling people to look at throughput time (lead-time) through the assembly line when measuring productivity? This number is completely unrelated to assembly line productivity. I have run into the situation where people charged with doing kaizen on assembly lines (industrial engineers, project managers) are measuring the

Continue Reading